The main gas pipeline «Kazakhstan-China»
Comprehensive corrosion inspection of the insulation coating and means of electrochemical protection of objects of the main gas pipeline «Kazakhstan-China»
(далее…)
Comprehensive corrosion inspection of the insulation coating and means of electrochemical protection of objects of the main gas pipeline «Kazakhstan-China»
(далее…)
Installation of tread installations on the water supply of the regional hospital №3 of the city of Turkestan.
(далее…)
Installation of cathodic protection stations on main gas pipelines passing through the territory of the Turkestan region:
«Bukhara gas-bearing region Tashkent-Bishkek-Almaty» JSC «Intergas Central Asia».
(далее…)
Electrical installation and commissioning works at the facilities of JSC «Intergas Central Asia»: Gas distribution station «Akshi» and Gas distribution station «Balpyk bi»
(далее…)
The work site, the main sites of the object «Construction of a gas measuring station and a shift settlement on the Gazli-Shymkent gas pipeline 314 km» is actually located on the 312 km of the Gazli-Shymkent gas pipeline, 2 km from the border with the Republic of Uzbekistan and is located 255 km in the south-south-west direction from the regional center of Turkestan, 265 km southwest of Shymkent, 105 km west of the Shardara district center.
(далее…)